Document Type : RESEARCH ARTICLE
Authors
Department of Environmental Planning and Infrastructure, Faculty of Urban and Regional Planning, Cairo University, Giza, Egypt
Graphical Abstract
Highlights
Ø An integrated GIS-MCDA-ENA framework identifies 847 ha of suitable eco-industrial park land across 18 sites in North Sinai, Egypt, proving methodology feasibility in an arid, data-scarce region;
Ø An 18-facility, 23-link network achieves robust targets (CI=0.34, FCI=0.41, APL=2.3) that match operational systems like Kalundborg, confirming design-phase performance viability;
Ø The design projects a 31% raw material reduction and 28% less waste, identifying the cement plant as the keystone facility (NC=0.42) for network resilience ahead of future LCA integration.
Keywords
INTRODUCTION
Global industrialization continues to intensify pressures on natural resources and ecosystems, driving urgent demand for sustainable industrial development models (Shahat et al., 2026). Eco-industrial parks (EIPs) represent a primary paradigm for balancing industrial expansion with environmental sustainability (Laili et al., 2024). By operationalizing core tenets of industrial ecology—most notably industrial symbiosis—these parks facilitate localized resource sharing, waste mitigation, and the establishment of circular material loops among co-located enterprises (Frosch and Gallopoulos, 1989; Chertow, 2000). The EIP concept has evolved substantially from early theoretical formulations (Frosch and Gallopoulos, 1989) into globally implemented frameworks supported by international organizations including the United Nations Industrial Development Organization (UNIDO, 2019) and the World Bank (2020). Operational examples including the Kalundborg Symbiosis in Denmark, the Tianjin Economic-Technological Development Area (TEDA) in China, and the Ulsan Eco-Industrial Park in South Korea have demonstrated the practical viability of industrial symbiosis at scale (Zhu et al., 2007; Park et al., 2008; Tian et al., 2014). Nevertheless, replicating these successful outcomes within arid regions of developing nations presents a profound challenge, primarily due to acute data scarcity and restricted institutional capacity (Hong and Gasparatos, 2020). Planning an effective EIP framework presents a complex spatial challenge, requiring the simultaneous balancing of competing criteria—ranging from infrastructure and resource accessibility to environmental conservation, flood mitigation, and land-use compatibility (Feizizadeh and Blaschke, 2013; Malczewski and Rinner, 2015). Geographical information system-multicriteria decision analysis (GIS-MCDA) provides a systematic framework for integrating these heterogeneous spatial datasets into composite suitability assessments (Eastman et al., 1995). However, conventional GIS-MCDA approaches for EIP site selection exhibit a critical methodological limitation: reliance on subjective expert weighting methods principally the analytic hierarchy process (AHP) (Saaty, 1980), which introduce decision-maker bias, reduce inter-study comparability, and compromise reproducibility (Wang and Lee, 2009; Zandi et al., 2021). Furthermore, existing literature on EIP site selection frequently decouple spatial suitability assessment from the design of industrial symbiosis networks. This fragmentation precludes the concurrent optimization of both the spatial and functional dimensions governing EIP performance (Hong and Gasparatos, 2020). This study presents the first integrated GIS-MCDA– ecological network analysis (ENA) framework for EIP planning in an arid, developing-country context (North Sinai, Egypt). Entropy weight method (EWM) replaces subjective AHP weighting with a reproducible, operator-independent weighting scheme derived from spatial data properties, while ENA quantifies network-level circularity indicators for holistic performance benchmarking against established EIPs. The primary objectives of this study are fourfold: a) to develop an objective, reproducible GIS-MCDA framework integrating the EWM for spatial suitability assessment of EIP sites in North Sinai, Egypt; b) to execute a comprehensive regional spatial suitability analysis to identify priority locations; c) to design an industrial symbiosis network consisting of 18 facilities organized across four industrial clusters and interconnected by 23 symbiotic exchange links; and d) to evaluate network performance using ENA based on five quantitative indicators, benchmarking the outcomes against established operational EIPs, including Kalundborg, Guitang, Ulsan. This study was conducted in East Baghdad Village of North Sinai Governorate, in 2026.
MATERIALS AND METHODS
Study area
The study area encompasses 3,619 ha in the East Baghdad Village of North Sinai Governorate, Egypt
with approximately 31°05′ north (N), 32°20′ east (E), situated approximately 45 km northeast of Al-Arish city. The region is characterized by an arid climate with mean annual precipitation below 100 millimeters (mm), predominantly flat to gently undulating terrain with 0–5 percent (%) slope, and predominantly sandy and sandy-loam soils. Geographically positioned within the Sinai Peninsula, the site aligns with a region of critical strategic and developmental significance within Egypt's national planning frameworks. The study area was selected based on four primary criteria: 1) availability of undeveloped state-owned land suitable for large-scale industrial development; 2) proximity to the Al-Salam Canal, providing a potential freshwater source; 3) access to the national road network and Port Said maritime infrastructure; and 4) designation within the North Sinai Industrial Development Zone under the Sinai Development Strategy 2030 (Egyptian Ministry of Planning, 2023). Collectively, these attributes underscore the strategic viability of the East Baghdad Village site as an optimal location for establishing an EIP development. Fig. 1 presents the study area location map showing the Proposed East Baghdad Village Eco-Industrial Park site within North Sinai Governorate, Egypt, including regional context and site boundaries.
Integrated GIS-MCDA–ENA research framework
The proposed framework integrates GIS-MCDA, the EWM, and ENA within a six-phase sequential workflow. Fig. 2 presents the overall framework architecture, illustrating the data flow and methodological linkages among the six phases. Crucially, this integration operates via a sequential rather than a simultaneous architecture: GIS-MCDA suitability mapping is completed first and its outputs specifically the High and Very High suitability zones directly constrain the spatial extent available for cluster allocation, which in turn defines the node set and physical adjacency structure for ENA. Consequently, the two components are linked via a structured data handoff rather than being concurrently optimized within a unified mathematical formulation.
Data acquisition and preprocessing
Thirteen spatial criteria were selected through a systematic literature review (UNIDO, 2019; Hong and Gasparatos, 2020; World Bank, 2020) and consultation with experts from the Department of Environmental Planning. The evaluation criteria were established based on historical literature recommendations and screened for regional suitability regarding environmental, planning, and data availability constraints. Accordingly, thirteen specific criteria encompassing environmental, infrastructural, and socio-economic dimensions were established to evaluate EIP suitability, as detailed in Table 1. Industrial ecology principles are explicitly embedded in the GIS-MCDA criterion set, ensuring that the highest-ranked sites are positionally advantageous for subsequent symbiosis network formation. Three criteria directly operationalise symbiosis feasibility: industrial land proximity (C9) minimises inter-facility material transfer distances; road network proximity (C7) enables logistics integration; and electricity grid proximity (C10) supports shared energy infrastructure. The highest-weighted environmental criterion, ecological sensitivity (C12, w=0.156), simultaneously minimises ecological disruption consistent with industrial ecology’s principle of minimising environmental burden. By harmonizing spatial optimization with the core tenets of industrial ecology, this framework transitions GIS-MCDA site selection and ENA network design from independent sequential phases into interdependent, mutually reinforcing stages of an integrated planning framework. All raster datasets were co-registered to a common coordinate system (WGS84 UTM Zone 36N) and resampled to a uniform 30 m spatial resolution using bilinear interpolation for continuous datasets (elevation, slope, groundwater depth, and spectral indices).

Fig. 1: Geographical location of the study area in the North Sinai Governorate and El-Hasana Center within North Sinai Governorate, highlighting the Baghdad area as well as Baghdad Village

Fig. 2: Integrated GIS-MCDA–ENA research framework
Table 1: summarizes the spatial criteria, data sources, and preprocessing methods employed in this study
|
Criterion |
Type |
Data source |
Resolution |
Preprocessing |
|
C1: Slope |
Cost |
Shuttle radar topography mission (SRTM) DEM |
30 m |
Slope calculation; reclassification to 1–5 scale |
|
C2: Elevation |
Cost |
SRTM DEM |
30 m |
Elevation extraction; normalization |
|
C3: Soil type |
Cost |
FAO soil map |
1:1,000,000 |
Rasterization; suitability scoring |
|
C4: Land use/land vover |
Cost |
Sentinel-2 (2023) |
10 m |
Supervised classification; resampling to 30 meters (m) |
|
C5: Distance to roads |
Cost |
Open street map |
Vector |
Euclidean distance calculation; normalization |
|
C6: Distance to utilities |
Cost |
Egyptian Electricity Holding Co. |
Vector |
Euclidean distance calculation; normalization |
|
C7: Distance to water |
Cost |
Al-Salam Canal Authority |
Vector |
Euclidean distance calculation; normalization |
|
C8: Distance to urban areas |
Benefit |
OpenStreetMap |
Vector |
Euclidean distance calculation; normalization |
|
C9: Distance to protected areas |
Benefit |
Egyptian Environmental Affairs Agency |
Vector |
Euclidean distance calculation; normalization |
|
C10: Groundwater depth |
Cost |
Ministry of Water Resources and Irrigation |
Point data |
Inverse distance weighting (IDW) interpolation; normalization |
|
C11: Flood risk |
Cost |
SRTM DEM + precipitation data |
30 m |
Hydrological modeling; risk classification |
|
C12: Environmental sensitivity |
Cost |
Composite (vegetation, soil, water) |
30 m |
Weighted overlay; normalization |
|
C13: Transportation accessibility |
Benefit |
Road network + port data |
Vector |
Network analysis; travel time calculation |
To maintain discrete class boundaries, categorical raster datasets—specifically land use/land cover (LULC) and soil type—were resampled utilizing nearest-neighbor interpolation. The flood-risk map was derived directly at 30 metre (m) resolution from DEM-based flow accumulation analysis and required no resampling. Sentinel-2 multispectral imagery (10-m resolution, acquired in 2023) was used for supervised land use/land cover classification and subsequently resampled to 30 m for consistency. Distance-based criteria (C5–C9, C13) were derived from vector datasets using Euclidean distance calculations in ArcGIS 10.8. To generate a continuous spatial surface, groundwater depth data (C10), originally collected as discrete point measurements, were spatially interpolated utilizing the IDW method. All criteria were normalized to a [0, 1] scale prior to EWM application.
EWM for objective criterion weighting
The EWM derives criterion weights from the information entropy of the normalized spatial data distributions. Under this approach, criteria demonstrating higher spatial variability are assigned greater weights, as their pronounced variance offers superior discriminatory power for differentiating suitable from unsuitable locations (Zou et al., 2006; Lotfi and Fallahnejad, 2010). The EWM calculation proceeds through six sequential steps, as follows:
Step 1: Normalization
For benefit criteria (higher values indicate higher suitability), using Eq. 1 (Zou et al., 2006):
xᵢⱼ⁎ = (xᵢⱼ − xₘᵢₙ) / (xₘₐₓ − xₘᵢₙ) (1)
For cost criteria (lower values = higher suitability), using Eq. 2 (Zou et al., 2006):
xᵢⱼ⁎ = (xₘₐₓ − xᵢⱼ) / (xₘₐₓ − xₘᵢₙ) (2)
Where: xij is the raw value of criterion j at pixel i, and xij* is the normalized value in the range [0, 1].
Step 2: Probability matrix
The normalized values are converted to a probability matrix representing the relative contribution of each pixel to criterion j's total information, using Eq. 3 (Shannon, 1948):
pᵢⱼ = xᵢⱼ⁎ / (∑ᵢ₌₁ⁿ xᵢⱼ⁎) (3)
Where: pij represents the proportion of criterion j’s total information content contributed by pixel i.
Step 3: Entropy calculation
Entropy is then calculated for each criterion from the probability matrix, using Eq. 4 (Shannon, 1948):
Eⱼ = −(1/ln n) ∑ᵢ₌₁ⁿ pᵢⱼ ln(pᵢⱼ) (4)
Where: Ej ∈ [0, 1] is the entropy of criterion j, and n is the total number of pixels. Higher entropy indicates more uniform spatial distribution (lower information content).
Step 4: Divergence
Divergence quantifies the information utility of each criterion by measuring the departure from maximum entropy, using Eq. 5 (Zou et al., 2006):
dⱼ = 1 − Eⱼ (5)
Where: dj is the divergence (information content) of criterion j. Higher divergence indicates greater spatial variability and thus higher discriminatory power.
Step 5: Weight derivation
Objective weights are derived by normalizing the divergence values across all criteria, ensuring that the weights sum to unity, using Eq. 6 (Zou et al., 2006):
wⱼ = dⱼ / (∑ⱼ₌₁ᵐ dⱼ) (6)
Where: wj is the objective weight of criterion j, and m = 13 is the total number of criteria. Weights are normalized such that Σwj = 1.
Reproducibility note: the study area raster comprised approximately 40,211 pixels at 30 m resolution. Prior to the EWM calculation, water bodies and missing-data pixels were excluded, restricting the final analysis to 38,900 valid land pixels. To avoid undefined logarithm values, a small constant ε = 10⁻⁶ was added to any zero normalized values before computing the probability matrix (Eq. 3) and entropy (Eq. 4). This procedure is executed to ensure numerical stability, computational robustness, reproducibility, and consistent entropy estimation across all evaluated criteria, conforming to standard practices in EWM applications (Lotfi and Fallahnejad, 2010).
Step 6: Weighted overlay
The final suitability score for each pixel is computed as a weighted linear combination of all normalized criteria, using Eq. 7 (Malczewski and Rinner, 2015):
Sᵢ = ∑ⱼ₌₁ᵐ wⱼ × xᵢⱼ⁎ (7)
Where: Si is the final suitability score for pixel i, ranging from 0 (unsuitable) to 1 (highly suitable).
Suitability classification and mapping
Final suitability scores were classified into five categories using the equal-interval classification method, which divides the normalized suitability index (0–1) into five equal intervals: Very low (0.00–0.20), Low (0.20–0.40), Moderate (0.40–0.60), High (0.60–0.80), and very high (0.80–1.00). Consequently, this approach provides transparent, consistent, and reproducible thresholds for interpreting normalized suitability scores, allowing effective cross-regional suitability comparisons. Fig. 3 presents the spatial suitability map for the study area.
Industrial Cluster Selection and Justification
Four industrial clusters were selected for the Proposed East Baghdad Village Eco-Industrial Park based on multiple strategic and environmental criteria: 1) compatibility with North Sinai's existing industrial base and raw material availability; 2) potential for high-value industrial symbiosis relationships; 3) alignment with Egypt's Vision 2030 industrial diversification targets; and 4) consistency with UNIDO (2019) guidelines for EIP cluster composition in developing countries. The selected clusters are: A fifth selection criterion — resource efficiency and industrial symbiosis potential — was embedded in the cluster composition. Each designated sector was systematically evaluated based on its capacity to generate or absorb by-products compatible with co-located industries: the cement plant generates fly ash with 32,000 tons per year (t/y) and carbon dioxide (CO₂) (8,500 t/y) absorbed by downstream facilities; the glass facility produces recoverable process heat (18 megawatt (MW)); the food processing cluster generates organic waste (4,200 t/y) suitable for fertilizer production; and the logistics hub facilitates material transfer with minimal additional infrastructure. This criterion ensures that the selected industrial composition maximizes network circularity potential from the outset of the design phase. To verify the robustness of the cluster selection, four alternative configurations were systematically evaluated prior to finalizing the proposed design. The proposed four-cluster configuration (construction materials, ceramics and glass, food processing, logistics) generated 23 symbiotic links, compared with 12–17 links in the alternative configurations considered. Consequently, the selection of the proposed configuration was justified by this superior symbiotic connectivity, alongside strategic alignment and resource availability criteria (Zhang et al., 2013).
Construction materials cluster
Cement production 500,000 t/y, concrete batching with 300,000 cubic meters per year (m³/y), gypsum board manufacturing (50,000 t/y), and aggregate processing (200,000 t/y). Leveraging the abundant limestone and gypsum deposits of North Sinai, this cluster effectively supplies the regional construction sector.
Ceramics and glass cluster
Ceramic tile production with 2 million square meters per year (Mm²/y), sanitary ware manufacturing (100,000 units/y), and glass container production (50,000 t/y). This cluster generates high-temperature waste heat, which is structurally suitable for symbiotic exchange with adjacent facilities.
Food Processing Cluster
Olive oil extraction (10,000 t/y), date processing (15,000 t/y), fish processing (8,000 t/y), and cold storage (30,000-ton capacity). This cluster generates organic waste streams viable for biomass fuel conversion and yields wastewater amenable to reclamation for landscape irrigation.
Logistics and warehousing cluster
Freight consolidation, cold chain logistics, and packaging services. This cluster provides supply chain coordination functions and serves as a material flow hub connecting the three production clusters with regional markets and Port Said maritime infrastructure. Material and energy input–output dynamics between facilities were determined in three stages. First, sector-level material and energy flows were compiled from facility design specifications and supplemented with published industrial benchmarks (UNIDO, 2019; IEA, 2021). Second, the development of bilateral compatibility matrices for each potential exchange pair facilitated the identification of technically viable by-product recovery opportunities. Third, flow magnitudes were derived using stoichiometric conversion factors applied to design capacity parameters, yielding the annual flow estimates (e.g., fly ash 32,000 t/y, process heat 18 MW, CO₂ 8,500 t/y, organic waste 4,200 t/y) that populate the 18×18 material-flow matrix. Four assumptions underpin the ENA application: 1) Consistent with conventional industry protocols for planned systems, the evaluation assumed steady-state operation at full design capacity, totaling 7,200 annual operating hours (Fath and Patten, 1999); 2) deterministic point estimates for all material and energy flows, with stochastic variability not explicitly modelled but partially addressed through sensitivity analysis. 3) the system boundary encompasses intra-park flows only, excluding upstream supply chains and downstream product distribution; and 4) In accordance with standard design-phase protocols, all technically feasible exchange configurations are assumed to be economically viable at design capacity, recognizing that post-commissioning economic validation will be required.
Ecological network analysis construction
ENA was applied to quantify material and energy flows within the proposed industrial symbiosis network and evaluate five system-level performance indicators. The network comprises 18 facilities (nodes) and 23 symbiotic exchange links (edges), as illustrated in Fig. 4. The ENA adjacency matrix F = [fᵢⱼ] represents material flows (t/y) from node i to node j. Flow magnitudes were estimated using: 1) facility design capacities; 2) material balance calculations based on stoichiometric relationships and industry-standard conversion factors; and 3) analogous operational data from comparable EIPs reported in the literature (Park et al., 2008; Sokka et al., 2011; Tian et al., 2014). All ENA outputs represent scenario-based modeled projections for the proposed, non-operational EIP; consequently, these findings should be interpreted within the context of these predictive boundaries. Fly ash (32,000 t/y) is generated from coal combustion in the cement plant pre-calciner, at approximately 12% of coal input by mass, and is collected via electrostatic precipitators (ESP) for transfer to concrete batching and ceramic tile production. To construct the ENA network, exchange pathways were systematically identified and integrated using a structured four-step protocol: 1) systematic screening of candidate sector pairs for by-product compatibility using established industrial symbiosis taxonomies (Chertow, 2007; UNIDO, 2019); 2) volumetric compatibility checking to confirm that by-product generation rates and receiving-facility absorption capacities are of commensurate magnitude; 3) iterative computation of ENA indicators (CI, FCI, APL, ND, TST) for successive network configurations, enabling evaluation of the marginal contribution of each candidate exchange link; and 4) prioritisation of high-CI and high-FCI links in the spatial layout to ensure that the most circularity-enhancing exchanges are supported by proximity and shared infrastructure.
To ensure robustness, the ENA results underwent pre-implementation validation via three complementary approaches: i) benchmarking against analogous operational EIPs (Kalundborg, Guitang, Ulsan), which confirms that the derived indicators CI=0.34, FCI=0.41, and APL=2.3 fall within the expected performance envelope for EIP networks of comparable scale and sector composition; ii) material balance cross-checking, in which all inflows and outflows for each facility node were verified for mass conservation; and iii) expert peer assessment by environmental planning specialists at Cairo University, who reviewed the key exchange flow estimates (fly ash 32,000 t/y, process heat 18 MW, organic waste 4,200 t/y) and confirmed their technical plausibility against operational analogues. To identify and quantify exchange flows, a systematic procedure was developed by integrating facility design specifications, the UNIDO Industrial Symbiosis Database (UNIDO, 2019), and Chertow’s (2007) by-product exchange taxonomy. To convert design capacity parameters into accurate annual flow estimates, stoichiometric material balances were systematically applied. The four principal exchange flows quantified are: fly ash from the cement plant to brick manufacturing (32,000 t/y), process heat from the glass facility to food processing (18 MW), CO₂ from the cement plant to on-site greenhouses (8,500 t/y), and organic waste from food processing to fertilizer production (4,200 t/y).
Five network performance indicators were calculated:
1. Total system throughput (TST):
The total system throughput measures, using Eq. 8 (Layton et al., 2016):
TST = ∑ᵢ₌₁ⁿ ∑ⱼ₌₁ⁿ fᵢⱼ (8)
Where: TST quantifies the total magnitude of material flows within the network, indicating overall system scale and activity level.
2. Cycling index (CI):
The cycling index measures the proportion of material flows that circulate within the network relative to total system throughput, using Eq. 9 (Layton et al., 2016):
CI = Cycled Flow / TST (9)
Where: CI measures the proportion of material flows that are recycled within the network, indicating circularity and resource efficiency. Higher CI values reflect greater industrial symbiosis intensity.
3. Network density (ND):
Network density measures the proportion of realized connections relative to all theoretically possible connections in the network, using Eq. 10 (Layton et al., 2016):
NDᵢ = (∑ⱼ fᵢⱼ) / TST (10)
Where: ND quantifies network connectivity as the ratio of realized to maximum possible connections. For the proposed EIP network: ND = L/[N(N−1)/2] = 23/[18×17/2] = 23/153 = 0.150, where L = 23 symbiotic links and N = 18 facilities. Network control (NC) is computed separately at the node level.
4. Average path length (APL):
Average path length is computed as the mean shortest path between all node pairs in the network, reflecting network compactness and material transfer efficiency, using Eq. 11 (Layton et al., 2016):
APL = 1/[n(n − 1)] ∑ᵢ≠ⱼ dᵢⱼ (11)
Where: dij is the shortest path length between nodes i and j. APL indicates network compactness and efficiency of material transfer.
5. Finn cycling index:
The Finn cycling index adjusts the cycling index by excluding dissipative flows such as emissions and waste disposal, providing a complementary measure of circularity, using Eq. 12 (Layton et al., 2016):
FCI = Cycled Flow / (TST − Dissipative Flow) (12)
Where: FCI adjusts CI by excluding dissipative flows (emissions, waste disposal), providing a complementary measure that characterizes the circularity of recoverable flows. Mathematically, FCI > CI (FCI = 0.41 > CI = 0.34) because the FCI denominator excludes dissipative flows, reducing the reference base and yielding a higher circularity ratio.
Validation and sensitivity analysis
Framework robustness was assessed through three complementary validation approaches. To execute a robust quantitative uncertainty analysis, a ±15% perturbation was simultaneously applied to all primary exchange flows. Under this perturbation range, the cycling index remained within CI=0.29–0.39 and the Finn cycling index within FCI=0.35–0.47, indicating that the principal ENA findings are robust to plausible input data uncertainty. The stability of the classification was validated through a criterion weight sensitivity analysis to address spatial data uncertainty, with the Overall Accuracy (OA) deviating by a marginal ±0.022 from the baseline OA=0.935. Irreducible design-phase uncertainty arising from the absence of operational facility-level inventory data cannot be eliminated through sensitivity analysis alone and will require post-commissioning validation. measurement and validation once the park becomes operational.
First: Internal spatial consistency was evaluated by verifying that the spatial distribution of highly suitable areas (high and very high classes) was consistent with the known physical geography of the study area - specifically, that high-suitability zones corresponded to flat, low-elevation terrain with good road access and proximity to the Al-Salam Canal, as expected from the criterion weights. Given that the proposed EIP at the East Baghdad Village is currently non-operational, validation is necessarily confined to internal model consistency, precluding direct comparison with observed outcomes.
Second: EWM-derived weights were compared with weights independently derived using the criteria importance through intercriteria correlation (CRITIC) method (Diakoulaki et al., 1995) and hypothetical equal weights (1/13 ≈ 0.077 per criterion) to assess methodological convergence. Spearman's rank correlation coefficient (ρ) was calculated between EWM and CRITIC weight rankings. The CRITIC method constructs a correlation matrix among all 13 criteria. The highest positive correlation was observed between C12 (Environmental sensitivity) and C3 (Slope) (r = 0.68), while C11 (Flood risk) and C2 (Elevation) exhibited a moderate negative correlation (r = −0.42). All inter-criterion correlations were below the multicollinearity threshold of |r| = 0.85, confirming criterion independence.
Third: A systematic sensitivity analysis was conducted by perturbing each criterion weight individually by ±20% and recalculating suitability scores. To provide a rigorous measure of classification robustness, the agreement between the perturbed and baseline maps was quantified using OA and the map-consistency coefficient (κ). Remaining criterion weights were proportionally renormalized to maintain Σwj = 1 following each ±20% perturbation. It should be emphasized that both OA and the map-consistency coefficient (κ) serve strictly as metrics ofclassification stability relative to the unperturbed baseline suitability map; rather than as measures of external validation accuracy against independent field-reference data.
RESULTS AND DISCUSSION
EWM-derived criterion weights
Table 2 presents the EWM-derived objective weights, entropy values, and divergence scores for the 13 spatial criteria. Environmental sensitivity (C12, criterion weight [w= 0.156), Flood risk (C11, w = 0.143), and Transportation Accessibility (C13, w = 0.138) received the highest weights, indicating their greater contribution to distinguishing suitable locations. Conversely, Distance to Urban Areas (C8, w = 0.039) and Distance to Utilities (C6, w = 0.045) were assigned the lowest weights, primarily due to their relatively uniform spatial distribution across the study area. Fig. 5 displays the criteria ranked in descending order according to their EWM-derived weights, thereby delineating their relative influence on the spatial distribution of suitability values across the study area. This pattern aligns with the predominantly rural landscape of the East Baghdad Village, a region characterized by a sparse and relatively uniform distribution of urban areas and utility infrastructure, with limited industrial and transportation development.
Table 2: EWM-derived criterion weights and entropy values
|
Criterion |
Entropy (Eⱼ) |
Divergence (dⱼ) |
Weight (wⱼ) |
Rank |
|
C1: Slope |
0.912 |
0.088 |
0.067 |
8 |
|
C2: Elevation |
0.895 |
0.105 |
0.080 |
6 |
|
C3: Soil type |
0.934 |
0.066 |
0.050 |
11 |
|
C4: Land use/land cover |
0.887 |
0.113 |
0.086 |
5 |
|
C5: Distance to roads |
0.923 |
0.077 |
0.059 |
9 |
|
C6: Distance to utilities |
0.941 |
0.059 |
0.045 |
12 |
|
C7: Distance to water sources |
0.878 |
0.122 |
0.093 |
4 |
|
C8: Distance to urban areas |
0.949 |
0.051 |
0.039 |
13 |
|
C9: Distance to protected areas |
0.902 |
0.098 |
0.075 |
7 |
|
C10: Groundwater depth |
0.918 |
0.082 |
0.062 |
10 |
|
C11: Flood risk |
0.814 |
0.186 |
0.143 |
2 |
|
C12: Environmental sensitivity |
0.793 |
0.207 |
0.156 |
1 |
|
C13: Transportation accessibility |
0.821 |
0.179 |
0.138 |
3 |
|
Sum |
— |
1.313 |
1.000 |
— |
Fig. 5: Criteria ranked in descending order of EWM weight (wⱼ). Rank labels above each bar indicate criterion importance
Spatial suitability assessment
The continuous suitability surface derived from the weighted overlay analysis was subsequently classified into five discrete categories. Table 3 summarizes the areal extent and percentage of each suitability class, and (Fig. 6) presents the corresponding spatial distribution. The results reveal that approximately 847 hectares (ha) (23.4% of the study area) is classified as high (623 ha, 17.2%) or very high (224 ha, 6.2%) suitability. Moderate suitability constitutes the dominant classification (1,271 ha, 35.1%), highlighting the transitional landscape characteristics that define a significant portion of the study area. Very low and low suitability zones (1,501 ha combined, 41.5%) correspond primarily to areas with high flood risk, elevated environmental sensitivity, or poor transportation accessibility, consistent with the high weights assigned to C12, C11, and C13, reflecting the combined influence of environmental constraints and infrastructure limitations on overall site suitability patterns.
Table 3: Suitability classification results for the proposed East Baghdad Village eco-industrial park study area
|
Suitability class |
Score range |
Area (ha) |
Percentage (%) |
|
Very low |
0.00–0.20 |
412 |
11.4 |
|
Low |
0.21–0.40 |
1,089 |
30.1 |
|
Moderate |
0.41–0.60 |
1,271 |
35.1 |
|
High |
0.61–0.80 |
623 |
17.2 |
|
Very high |
0.81–1.00 |
224 |
6.2 |
|
Total |
— |
3,619 |
100.0 |

Fig. 6: Spatial suitability classification results showing the distribution of five suitability classes across the study area
Industrial cluster allocation
The four industrial clusters were spatially allocated within the High and Very High suitability zones identified by the GIS-MCDA assessment (Xu et al., 2022). The total suitable area of 847-ha was designated as the comprehensive EIP planning envelope, encompassing both industrial production areas and supporting land uses. To evaluate alternative organizational concepts for the proposed EIP, two distinct spatial planning scenarios were established prior to formulating the definitive master plan.
Alternative 1:
To maximize road accessibility and simplify infrastructural development, this study utilizes a corridor-based linear configuration wherein industrial clusters are concentrated along the primary transportation axis. Although this arrangement reduced transportation distances, it generated fewer opportunities for industrial symbiosis because related industries were more spatially separated and supporting facilities were less centrally integrated.
Alternative 2:
It is adopted a functionally integrated cluster configuration that grouped complementary industries according to their potential material and energy exchanges while maintaining accessibility to the regional transportation network. Supporting facilities, utility areas, and service functions were positioned centrally to improve operational efficiency and facilitate future industrial symbiosis development. The above two alternatives were evaluated using a combination of planning and sustainability criteria derived from the objectives of this study, including consistency with the GIS-MCDA suitability assessment, industrial symbiosis potential, transportation accessibility, infrastructure efficiency, land-use compatibility, environmental protection, and future expansion opportunities. Based on this multi-criteria assessment, Alternative 2 was selected as it offered an optimal trade-off among spatial suitability, industrial integration, infrastructure sharing, operational efficiency, and long-term sustainability (Yu et al., 2023). The characteristics of the four industrial clusters featured in the selected alternative, comprising allocated land areas, mean suitability scores, primary facilities, and projected employment, are detailed in Table 4. The logistics and warehousing cluster achieved the highest mean suitability score (0.76), reflecting its allocation to the most accessible and topographically favorable areas. The construction materials cluster was allocated to zones with high transportation accessibility and proximity to major road infrastructure. To accommodate critical operational requirements, the food processing cluster, notwithstanding its low mean suitability score of 0.68, was allocated to zones featuring enhanced water accessibility. Within the 847-ha EIP planning envelope, approximately 525 ha were allocated to industrial production areas, while the remaining 322 ha were reserved for supporting land uses, including internal roads, utility areas, secondary service facilities, central services, and green spaces. Fig. 7a illustrates the two evaluated planning alternatives: the preliminary layout (Alternative 1) and the selected refined layout (Alternative 2). Building upon the selected alternative (Fig. 7b) presents the final master plan of the proposed East Baghdad Village Eco-Industrial Park, showing the spatial allocation of the four industrial clusters—construction materials, ceramics and glass, food processing, and logistics and warehousing—together with secondary service facilities, central services, utility areas, transportation infrastructure, wastewater treatment facilities, and green spaces (Valenzuela et al., 2018). The framework enhances the operational performance and long-term sustainability of the proposed eco-industrial park by streamlining inter-industry interactions, facilitating waste-to-resource exchanges, optimizing logistical accessibility, and incorporating robust environmental buffer areas.
Ecological network analysis result
All ENA metrics reported in this section represent scenario-based modeled projections for the proposed, non-operational EIP and should be interpreted as design performance targets rather than measured outcomes. Table 5 presents the five ENA performance indicators for the proposed industrial symbiosis network. Utilizing the high-suitability zones identified in the spatial assessment, the boundaries of the four industrial clusters were established, followed by quantification of facility-level material and energy flows via ENA. TST = 2.87 Mt/y represents the total material flows within the EIP system boundary, calculated as the sum of primary material inputs (zi = 1.92 Mt/y), inter-facility exchanges (fij = 0.68 Mt/y), and product outputs (yi = 0.27 Mt/y), consistent with the ENA convention (Ulanowicz, 1986). This moderate TST is consistent with the proposed EIP's regional scale and substantially lower than large-scale operational parks such as TEDA (12.5 Mt/y) and Ulsan (18.3 Mt/y), reflecting differences in facility numbers and industrial diversity. CI = 0.34 indicates that approximately 34% of material flows are recycled through industrial symbiosis. This value is comparable to the Kalundborg Symbiosis (CI = 0.38) and exceeds both TEDA (CI = 0.31) and Ulsan (CI = 0.29), demonstrating competitive circularity despite its smaller scale. This assessment is validated by the Finn Cycling Index (FCI = 0.41), indicating a 41% circularity rate when dissipative flows are excluded. APL = 2.3 indicates that materials pass through an average of 2.3 nodes before exiting the system, underscoring a highly integrated and compact network topology. This value is comparable to Kalundborg (APL = 2.1) and more compact than TEDA (APL = 2.8) and Ulsan (APL = 3.2), indicating efficient material routing (Fig. 8). NC analysis (Table 6) identifies the Cement plant as the keystone facility (NC = 0.42), exerting the greatest influence on network flows.
Table 4: Industrial cluster characteristics and spatial allocation
|
Cluster |
Area (ha) |
Mean suitability score |
Primary facilities |
Projected employment |
|
Construction materials |
178 |
0.74 |
Cement, concrete, gypsum board, aggregates |
850 |
|
Ceramics and glass |
123 |
0.71 |
Ceramic tiles, sanitary ware, glass containers |
620 |
|
Food processing |
97 |
0.68 |
Olive oil, dates, fish processing, cold storage |
480 |
|
Logistics and warehousing |
127 |
0.76 |
Freight consolidation, cold chain, packaging |
390 |
|
Internal Roads |
102 |
- |
Transportation access and internal circulation |
- |
|
Utility areas |
68 |
- |
Water, energy, and service networks |
- |
|
Green spaces |
85 |
- |
Environmental buffers and landscape areas |
- |
|
Wastewater treatment and services |
67 |
- |
Treatment facilities and Secondry and central services |
- |
|
Total |
847 |
- |
Industrial zones + supporting land uses |
- |

Fig. 7a: Planning concepts and alternatives: (a) Concept 1; (b) Alternative 1; (c) Concept 2; (d) Alternative 2

Fig. 7b: Master plan of the proposed East Baghdad Village Eco-Industrial Park, North Sinai, Egypt
Table 5: ENA performance indicators for the proposed ENA scenario
|
Indicator |
Value |
Unit |
Interpretation |
|
Total system throughput |
2.87 |
Mt/y |
Total material flow magnitude across all 23 symbiotic links |
|
CI |
0.34 |
— |
34% of material flows are recycled internally within the network |
|
FCI |
0.41 |
— |
41% circularity when dissipative flows are excluded |
|
APL |
2.3 |
— |
Materials pass through an average of 2.3 facilities before exiting |
|
Network density |
0.075 |
— |
75% of all possible directed connections are realized |
Table 6: NC values for key facilities in the proposed ENA scenario
|
Facility |
Cluster |
NC Value |
Interpretation |
|
Cement plant |
Construction materials |
0.42 |
Keystone facility; highest flow control |
|
Concrete batching |
Construction materials |
0.18 |
Major material hub |
|
Ceramic tiles |
Ceramics and glass |
0.14 |
High symbiosis integration |
|
Gypsum board |
Construction materials |
0.09 |
Moderate control |
|
Glass containers |
Ceramics and glass |
0.07 |
Moderate control |
|
Olive oil extraction |
Food processing |
0.05 |
Low control; peripheral node |
|
Cold storage |
Logistics and warehousing |
0.03 |
Low control; service function |
|
Others (11 facilities) |
Various |
< 0.02 |
Minimal individual control |

Fig. 8: Comparative ENA performance indicators (Cycling Index, Finn Cycling Index, Average Path Length, and Network Density) for the proposed East Baghdad Village EIP versus three operational EIPs (Kalundborg, TEDA, Ulsan). Radar chart and grouped bar chart visualizations
Material and energy flow quantification
Table 7 quantifies the major material and energy flows within the proposed industrial symbiosis network, demonstrating the potential for resource recovery and waste valorization. Compared to a conventional, non-integrated industrial baseline, the identified symbiotic linkages augment resource efficiency through by-product valorization, waste-heat recovery, and the reuse of treated wastewater (Simboli et al., 2015). The cement kiln dust flow (45,000 t/y) and fly ash exchange (32,000 t/y) represent the highest-magnitude solid material flows, while waste-heat recovery (30 megawatt thermal (MWth) combined) constitutes the most significant energy symbiosis. In the arid region of North Sinai, where freshwater conservation represents a critical environmental and operational imperative, the treated wastewater flow of 120,000 m³/y is of notable significance for enhancing regional water resource sustainability and supporting long-term agricultural resilience initiatives.
Table 7: Major symbiotic material and energy flows in the proposed ENA scenario
|
Flow Type |
Source |
Destination |
Magnitude |
Unit |
Environmental benefit |
|
Cement kiln dust |
Cement plant |
Ceramic tiles |
45,000 |
t/y |
Reduces raw material extraction; replaces virgin silica |
|
Fly ash |
Cement plant |
Concrete batching |
32,000 |
t/y |
Reduces cement consumption by approximately 8% |
|
Waste heat |
Cement kiln |
Food processing |
18 |
MWth |
Reduces natural gas consumption in food drying |
|
Waste heat |
Ceramic kiln |
Food processing |
12 |
MWth |
Reduces natural gas consumption in cold chain |
|
Organic waste |
Food processing |
Cement Plant |
8,500 |
t/y |
Biomass fuel; reduces coal consumption by ~5% |
|
Treated wastewater |
Food processing |
Landscape irrigation |
120,000 |
m³/y |
Reduces freshwater demand; conserves Al-Salam Canal allocation |
|
Packaging waste |
All vlusters |
Recycling facility |
3,200 |
t/y |
Reduces landfill disposal; generates recyclate revenue |
|
Scrap metal |
All clusters |
External recycler |
1,800 |
t/y |
Revenue generation; reduces virgin metal demand |
Energy demand and carbon footprint
A summary of the forecasted energy consumption and carbon emissions for each industrial cluster under the proposed ENA framework is presented in Table 8, with the corresponding trends illustrated graphically in Fig. 9. The construction materials cluster dominates both energy demand (167 MW electrical, 145 MWth thermal) and carbon emissions with 285 Kilotonne Carbon dioxide per year (kt CO₂/y), reflecting the energy-intensive nature of cement and ceramic production. The total projected CO₂ emissions of 515 kt/y represent a baseline against which the carbon reduction potential of renewable energy integration and waste heat recovery can be evaluated in future studies. The projected energy demand and CO₂ emissions were estimated using representative operating parameters. These included 7,200 annual operating hours, cluster-specific capacity factors (85% for construction materials, ceramics and glass clusters, 75% for the food processing cluster, and 90% for the Logistics and Warehousing cluster), standard energy conversion relationships, and distinct CO₂ emission factors of 0.82 metric tons of carbon dioxide per megawatt-hour (tCO₂/MWh) for electricity and 0.27 metric tons of carbon dioxide per gigajoule (tCO₂/GJ) for natural gas. A comparative methodological approach was employed to systematically quantify the resulting environmental benefits. Energy reductions were estimated by comparing the symbiosis scenario (with all 23-exchange links active) against a conventional scenario in which each facility operates independently using virgin inputs. Carbon savings were calculated applying emission factors of 0.82 t CO₂/MWh for electricity substitution and 0.27 t CO₂/GJ for recovered process heat, consistent with Egyptian national grid and industrial sector benchmarks (IEA, 2021). Circularity performance is expressed through CI=0.34 and FCI=0.41, derived from the 18×18 material-flow matrix. Calculated at a design-capacity operation of 7,200 h/y, the total environmental benefits show a 31% raw material reduction and a 28% waste reduction. These figures represent the mass-balance differences between the industrial symbiosis and conventional baselines.
Sensitivity analysis
Sensitivity analysis results are presented in Table 9a and Table 9b. Table 9a compares EWM-derived weights against CRITIC weights and equal weights for all 13 criteria. Table 9b presents classification agreement metrics (OA and κ) under ±20% individual weight perturbation, with remaining criterion weights proportionally renormalized to maintain Σwj = 1 after each perturbation, ensuring overall weighting scheme consistency throughout.
Table 8: Projected energy demand and carbon emissions by cluster (proposed ENA scenario)
|
Cluster |
Electrical Demand (MW) |
Thermal Demand (MWth) |
Total Energy (GJ/y) |
CO₂ Emissions (kt/y) |
|
Construction Materials |
87 |
145 |
1,820,000 |
285 |
|
Ceramics and glass |
52 |
98 |
1,180,000 |
178 |
|
Food processing |
18 |
22 |
315,000 |
38 |
|
Logistics and warehousing |
10 |
5 |
118,000 |
14 |
|
Total |
167 |
270 |
3,433,000 |
515 |

Fig. 9: Projected energy demand (MW electrical, MWth thermal) and CO₂ emissions (kt/y) by industrial cluster for the proposed East Baghdad Village Eco-Industrial Park. (Left) Grouped bar chart of energy demand by cluster. (Right) CO₂ emissions
Table 9a: Comparison of criterion weights derived by EWM, CRITIC, and equal weighting methods
|
Criterion |
EWM weight |
CRITIC weight |
Equal weight |
EWM rank |
CRITIC rank |
|
C1: Slope |
0.067 |
0.082 |
0.077 |
8 |
6 |
|
C2: Elevation |
0.080 |
0.075 |
0.077 |
6 |
7 |
|
C3: Soil type |
0.050 |
0.058 |
0.077 |
11 |
11 |
|
C4: Land use/land cover |
0.086 |
0.091 |
0.077 |
5 |
4 |
|
C5: Distance to roads |
0.059 |
0.068 |
0.077 |
9 |
9 |
|
C6: Distance to utilities |
0.045 |
0.052 |
0.077 |
12 |
12 |
|
C7: Distance to water sources |
0.093 |
0.087 |
0.077 |
4 |
5 |
|
C8: Distance to urban areas |
0.039 |
0.045 |
0.077 |
13 |
13 |
|
C9: Distance to protected areas |
0.075 |
0.071 |
0.077 |
7 |
8 |
|
C10: Groundwater depth |
0.062 |
0.065 |
0.077 |
10 |
10 |
|
C11: Flood risk |
0.143 |
0.135 |
0.077 |
2 |
2 |
|
C12: Environmental sensitivity |
0.156 |
0.148 |
0.077 |
1 |
1 |
|
C13: Transportation accessibility |
0.138 |
0.123 |
0.077 |
3 |
3 |
Table 9b: Sensitivity analysis results: classification agreement under ±20% weight perturbation
|
Perturbed criterion |
OA (+20%) |
κ (+20%) |
OA (−20%) |
κ (−20%) |
Mean OA |
Stability rank |
|
C1: Slope |
0.94 |
0.89 |
0.95 |
0.90 |
0.945 |
5 |
|
C2: Elevation |
0.93 |
0.87 |
0.94 |
0.88 |
0.935 |
6 |
|
C3: Soil type |
0.97 |
0.94 |
0.97 |
0.94 |
0.970 |
2 |
|
C4: Land use/land cover |
0.92 |
0.86 |
0.93 |
0.87 |
0.925 |
7 |
|
C5: Distance to roads |
0.96 |
0.92 |
0.96 |
0.92 |
0.960 |
3 |
|
C6: Distance to utilities |
0.98 |
0.96 |
0.98 |
0.96 |
0.980 |
1 |
|
C7: Distance to water sources |
0.91 |
0.84 |
0.92 |
0.85 |
0.915 |
8 |
|
C8: Distance to urban areas |
0.98 |
0.95 |
0.98 |
0.95 |
0.980 |
1 |
|
C9: Distance to protected areas |
0.95 |
0.90 |
0.95 |
0.90 |
0.950 |
4 |
|
C10: Groundwater depth |
0.96 |
0.91 |
0.96 |
0.91 |
0.960 |
3 |
|
C11: Flood risk |
0.87 |
0.78 |
0.88 |
0.80 |
0.875 |
10 |
|
C12: Environmental sensitivity |
0.85 |
0.75 |
0.86 |
0.77 |
0.855 |
11 |
|
C13: Transportation accessibility |
0.89 |
0.81 |
0.90 |
0.83 |
0.895 |
9 |
|
Mean |
0.93 |
0.87 |
0.94 |
0.88 |
0.935 |
— |
The EWM and CRITIC weight rankings demonstrate strong convergence (Spearman's ρ = 0.96), with identical top-three rankings (C12, C11, C13) and identical bottom-three rankings (C8, C6, C3). This robust rank-order correspondence between two independent, objective weighting paradigms offers substantial validation that the derived weights encapsulate authentic spatial variability patterns inherent in the dataset, rather than introducing methodological artifacts. The most notable discrepancy occurs for C1 (Slope), which ranks 8th under EWM but 6th under CRITIC a minor difference with limited practical consequence given the low-to-moderate weights involved. The sensitivity analysis indicates strong overall classification robustness, featuring a mean classification stability OA of 0.935 and a mean map-consistency coefficient (κ) of 0.875 throughout all perturbation scenarios. As expected, the highest-weight criteria C12 (Environmental sensitivity, mean OA = 0.855), C11 (Flood risk, mean OA = 0.875), and C13 (Transportation accessibility, mean OA = 0.895) — exhibit the greatest sensitivity, confirming that these criteria are the primary drivers of suitability classification. Conversely, low-weight criteria, such as distance to utilities (C6) and distance to urban areas (C8), exhibit minimal sensitivity with a mean OA of 0.980, showing that they have limited influence on the final classification. Fig. 10 presents the sensitivity analysis results graphically. Removal of the cement plant (keystone facility, NC=0.42) reduces CI by 38% (from 0.34 to 0.21) and FCI by 35% (from 0.41 to 0.27), confirming its critical role in network circularity. A 50% reduction in fly ash generation reduces CI by 14%, reflecting the significance of this flow for downstream material cycling. An 11% reduction in FCI after removing the CO₂ exchange link highlights the role of gaseous exchanges, while scale-independent CI and FCI confirm structural network properties rather than absolute flow volumes.
Comparative ENA benchmarking
Table 10 compares key ENA performance indicators for the proposed East Baghdad Village EIP against three operational EIPs: Kalundborg (Denmark), TEDA (China), and Ulsan (South Korea). The comparative benchmarking results are illustrated in Fig. 11, with reference data for Kalundborg, TEDA, and Ulsan compiled from Zhu et al. (2007), Park et al. (2008) and Tian et al. (2014) respectively. A comparative benchmarking analysis demonstrates that the projected ENA performance targets for the proposed East Baghdad Village EIP align broadly with documented values from operational industrial parks, with the caveat that the proposed metrics represent ex-ante design projections rather than ex-post empirical outcomes. The projected CI value (0.34) falls within the range reported for established EIPs, including TEDA (0.31), Ulsan (0.29), and Kalundborg (0.38), suggesting the potential for a highly interconnected industrial symbiosis network. The projected APL value (2.3) indicates an efficient material-routing structure within the proposed network, with a similar order of magnitude to reported EIP examples, while acknowledging differences in system boundaries, network representations, and data sources.
Advantages of objective weighting in EIP planning
The application of EWM for criterion weighting addresses a critical methodological limitation of conventional GIS-MCDA approaches for EIP site selection. The widespread use of AHP and expert-based weighting introduces subjectivity into the decision-making process, potentially reducing transparency and reproducibility, while limiting methodological consistency across different applications and study contexts (Spyridonidou and Vagiona, 2021). Consequently, this can cause inconsistent results across studies, reduce reproducibility, and open the door for non-scientific influences in practical site selection planning (Saaty, 1980; Wang and Lee, 2009). EWM eliminates this subjectivity by deriving weights directly from the statistical properties of the spatial data, ensuring that criterion importance reflects genuine spatial variability in the study area (Lotfi and Fallahnejad, 2010).
Fig. 10: Sensitivity analysis results showing classification stability (OA and κ) under ±20% criterion weight perturbations
Table 10: Comparative ENA performance: proposed East Baghdad EIP vs. operational EIPs
|
Indicator |
East Baghdad |
Kalundborg |
TEDA |
Ulsan |
Interpretation |
|
TST (Mt/y) |
2.87 |
4.2 |
12.5 |
18.3 |
Moderate scale; appropriate for regional context |
|
CI |
0.34 |
0.38 |
0.31 |
0.29 |
Comparable circularity to operational parks |
|
FCI |
0.41 |
0.45 |
0.38 |
0.35 |
Moderate-to-high circularity |
|
APL |
2.3 |
2.1 |
2.8 |
3.2 |
Compact network; efficient material routing |
|
Number of facilities |
18 |
9 |
47 |
62 |
Moderate network size; scalable design |
|
Symbiotic links |
23 |
15 |
68 |
89 |
Moderate symbiosis density; growth potential |
The EWM-derived weight distribution reveals environmentally protective planning priorities: Environmental sensitivity (w = 0.156), Flood risk (w = 0.143), and Transportation Accessibility (w = 0.138) collectively account for 43.7% of total weight. This distribution aligns with the physical geomorphology of the arid North Sinai landscape, wherein environmental sensitivity and flash-flood risk exhibit pronounced spatial heterogeneity — attributes that render these specific criteria highly deterministic for optimal site selection. The strong convergence between EWM and CRITIC weights (Spearman's ρ = 0.96) provides compelling cross-validation evidence that the derived weights are robust and not method-dependent. This convergence is consistent with findings by Wang and Lee (2009) and Zandi et al. (2021), who demonstrated that objective weighting methods generally produce more stable and reproducible results than subjective approaches. Unlike earlier EIP site-selection studies that relied on AHP (Nuhu et al., 2021; Nuhu et al., 2022), the EWM approach provides two distinct benefits. First, it removes the requirement for expert panels, allowing the method to be used even when local domain expertise is scarce. Second, it generates weights that are transparent and easily reproduced using only the input data.

Fig. 11: Comparative benchmarking of ENA performance indicators between the proposed East Baghdad Village Eco-Industrial Park and three operational EIPs (Kalundborg, TEDA, Ulsan). Radar chart showing normalized indicator values
Integration of spatial optimization and network performance
A key innovation of this framework is the integration of GIS-MCDA spatial optimization with ENA network performance evaluation within a single unified workflow. In traditional EIP planning literature, site selection and industrial symbiosis network design are frequently conceptualized as decoupled, sequential procedures, thereby hindering the integrated, simultaneous optimization of both spatial and functional system configurations (Gibbs and Deutz, 2007; Hong and Gasparatos, 2020). The present framework addresses this gap by using GIS-MCDA suitability results to directly inform cluster spatial allocation, which in turn defines the physical constraints for ENA network construction. A CI of 0.34 is achieved by the proposed industrial symbiosis network, exceeding the capacities of TEDA (0.31) and Ulsan (0.29). This performance nears that of Kalundborg (0.38), which represents the global benchmark for mature, self-organizing industrial ecosystems. This result is particularly noteworthy because Kalundborg's symbiosis developed over several decades through incremental bilateral agreements (Chertow, 2000), whereas the proposed network was systematically designed from the outset using ENA principles. Keystone analysis enables targeted design decisions — identification of the cement plant as the critical node (NC=0.42) allows planners to prioritise infrastructure investment around this facility to protect network resilience. The synergistic effect achieves a 31% mitigation in raw material consumption alongside a 28% decrease in waste generation relative to the conventional baseline scenario.
Applicability in arid, resource-constrained environments
The proposed East Baghdad Village EIP case provides a proof-of-concept demonstration of the framework's applicability in an arid, data-scarce, developing-country context. The exclusive reliance on freely available remote sensing data (Sentinel-2, SRTM) and open geospatial datasets (OpenStreetMap, FAO Soil Map). This choice ensures reproducibility in other data-constrained regions, which is essential for EIP planning across Sub-Saharan Africa and the MENA region. The projected water demand for the proposed EIP is approximately 1.2 million m³/y. This requirement can be partially met through a combination of Al-Salam Canal allocation and treated wastewater reuse, which includes 120,000 m³/y from the food processing cluster. Water conservation is a critical constraint in arid environments, and the framework's explicit incorporation of Distance to water sources (C7, w = 0.093) and Groundwater depth (C10, w = 0.062) as site selection criteria ensures that water availability is systematically considered in the suitability assessment. This water-sensitive planning paradigm aligns with the IPCC (2022) projections, which forecast escalating water scarcity within arid regions under various climate change scenarios.
Policy implications and implementation pathways
Successful implementation of the Proposed East Baghdad Village EIP requires coordinated policy interventions across multiple domains. First, land allocation and zoning frameworks must designate the identified high-suitability zones with 847 hectares (ha) for industrial development under the North Sinai Development Zone regulations. Second, infrastructure development must be prioritized, with specific emphasis on upgrading transport networks, extending utility grids, and securing water allocations from the Al-Salam Canal. Third, the establishment of fiscal incentive frameworks—comprising tax exemptions, subsidized utility connections, and dedicated industrial symbiosis facilitation funds—is imperative to attract anchor tenants and foster active participation in inter-firm symbiotic exchanges. Fourth, a dedicated EIP Management Entity should be established to coordinate symbiosis exchanges, monitor environmental performance, and provide the institutional continuity necessary for long-term network evolution. These policy requirements align with UNIDO (2019) guidelines for EIP development in developing countries and with Egypt's Vision 2030 industrial development objectives (Egyptian Ministry of Planning, 2023). Practical implementation of the proposed EIP faces barriers at three levels. At the market and contractual level, stable offtake agreements between exchange partners are required to ensure continuous material and energy flows; these require legal frameworks and long-term supply contracts that go beyond conventional industrial zoning. The EIP master plan must incorporate the significant capital investments required for the specialized technical handling of key by-products, including pneumatic fly ash conveyance, CO₂ compression and piping, and waste heat exchanger networks. At the regulatory and permitting level, waste-to-secondary-material reclassification procedures under Egyptian environmental regulations must be resolved to enable by-product exchange without regulatory impediment.
Practical implementation requirements
Practical implementation of the proposed framework requires: 1) high-resolution topographic data (≥10-m DEM) for detailed flood risk and drainage modeling; 2) updated land use/land cover mapping at 10-m resolution or finer; 3) detailed geological and geotechnical surveys for foundation design; (4) site-specific hydrological modeling for wadi flood risk assessment; and 5) engineering-level material balance data from prospective industrial tenants to refine ENA flow estimates. The developed framework, predicated on 30 m spatial resolution imagery and ex-ante design-capacity estimations, serves as a preliminary strategic planning baseline; however, integration of high-resolution, site-specific datasets remains imperative for detailed engineering and design execution.
Limitations and future research directions
Several important limitations of this study should be acknowledged. First, the framework relies on publicly available spatial datasets (Sentinel-2, SRTM, Open Street Map) with spatial resolutions of 10–30 m. While providing an acceptable baseline for regional strategic planning, these datasets are constrained by a spatial granularity that may preclude the detection of localized spatial heterogeneity necessary for detailed engineering design. Higher-resolution data (e.g., LiDAR-derived DEMs, sub-meter aerial imagery) would improve the precision of suitability mapping in future applications. Second, all ENA results are scenario-based modeled projections derived from facility design capacities and literature-based conversion factors, not measurements from an operational EIP. The projected CI (0.34), FCI (0.41), and TST (2.87 Mt/y) represent design performance targets that may differ from actual operational outcomes due to market fluctuations, operational inefficiencies, and unforeseen technical constraints. Third, the framework assumes a single development scenario with four predefined industrial clusters. Suitability distributions and ENA performance outcomes may vary under alternative scenarios, such as modifying cluster configurations, implementing phased development, or incorporating renewable energy infrastructure. Fourth, social dimensions of EIP planning including community acceptance, labor market analysis, and social impact assessment are not addressed in the current framework. Integrating social multi-criteria analysis (SMCA) into future iterations would provide a more comprehensive planning foundation. Fifth, climate change impacts on water availability, flood risk, and temperature extremes are not explicitly modeled. To rigorously evaluate the long-term operational viability of the proposed site under shifting environmental regimes, future investigations should systematically integrate macro-scale climate projections (IPCC, 2022). Future studies should: 1) refine ENA flow estimates using site-specific engineering data from prospective industrial tenants; 2) evaluate alternative industrial cluster compositions using multi-objective optimization. The cycling index (CI=0.34) achieved by the proposed EIP lies below that of the Kalundborg EIP (CI≈0.71) and the Guitang EIP (CI≈0.52). Three design-phase constraints explain this gap: restricted sectoral diversity within the existing four-cluster configuration, a lack of integrated water recycling loops, and no combined heat and power (CHP) systems. These features, which contribute substantially to cycling in mature operational EIPs, were excluded due to data availability and design-stage limitations. Future network expansion incorporating 8–12 additional exchange links, including water recirculation and CHP is projected to raise CI to the 0.50–0.55 range, approaching the Guitang benchmark. Consequently, this gap should be viewed as a starting point for the design phase rather than a permanent limit on what the system can achieve. Life cycle assessment (LCA) was not integrated into the current framework due to the design-phase constraint: facility-level inventory data required for LCA (material inputs, emissions, waste streams at operational scale) are not yet available for a planned park (Finnveden et al., 2009). Carbon savings reported in this study are limited to operational flow substitution, calculated using emission factors of 0.82 t CO₂/MWh and 0.27 t CO₂/GJ for recovered process heat (IEA, 2021), and do not include upstream supply chain or construction phase emissions.
Uncertainty assessment
Several sources of uncertainty affect the modeled outputs of this framework. Sources of spatial data uncertainty in this framework are threefold, originating from the 30 m resolution of the primary input datasets, interpolation-induced errors in groundwater depth estimations, and classification inaccuracies inherent in the supervised land use and land cover mapping of Sentinel-2 imagery. ENA flow uncertainty results from the use of design capacity estimates and literature-based conversion factors rather than measured operational data; therefore, flow magnitudes may vary depending on future operational conditions. Sensitivity analysis results (mean classification stability OA = 0.935) demonstrate that suitability classification remains stable under ±20% criterion weight perturbations, providing an assessment of spatial uncertainty within the GIS-MCDA component. To better understand uncertainty propagation across both the GIS-MCDA and ENA components of the framework, subsequent studies should utilize precise field measurements alongside Monte Carlo simulation.
CONCLUSION
This study developed and validated an integrated GIS-MCDA–ENA framework for planning the Proposed East Baghdad Village EIP in North Sinai Governorate, Egypt, advancing conventional methodologies into a reproducible six-phase workflow. A highly suitable or very highly suitable classification for industrial development was assigned to 847 ha (23.4% of the 3,619-ha study footprint) following high-resolution GIS-MCDA execution. The localized suitability profiles were heavily driven by three dominant spatial constraints and opportunities: environmental sensitivity (w = 0.156), flood vulnerability (w = 0.143), and transportation accessibility (w = 0.138). Complementing this, an ecological network analysis (ENA) of the proposed 18-facility, 23-link four-cluster network yielded robust performance targets (CI = 0.34, FCI = 0.41, APL = 2.3) comparable to established operational EIPs, confirming a strong potential for resource efficiency and waste reduction, with projected reductions of approximately 31% in raw material consumption and 28% in waste generation relative to a non-integrated baseline. The methodological reliability of the workflow was verified by strong convergence between EWM and CRITIC weights (Spearman's rho = 0.96) and high classification stability (mean OA = 0.935, mean kappa = 0.875). To prioritize redundancy investments, a keystone analysis successfully isolated critical nodes, yielding an NC of 0.42 for the cement plant. Additionally, the network's modular architecture allows for incremental expansion or facility substitution without interrupting the primary exchange triad between the cement, glass, and food processing facilities. By leveraging freely available remote sensing and geospatial datasets, this framework demonstrates a clear proof-of-concept for application in data-scarce, arid, and resource-constrained environments. The modular structure allows regional indicators to be substituted seamlessly—such as replacing Egyptian-specific criteria like Nile water proximity or sandstorm risk with equivalent local variables—rendering the entire workflow highly transferable to other developing nations. Consequently, these outcomes yield a robust scientific foundation through which urban planners, policymakers, and industrial stakeholders can strategize the development of sustainable EIPs. By doing so, the proposed framework fosters meaningful convergence with the localized targets of Egypt's Vision 2030 as well as the global mandates of SDG 9 and SDG 11. To advance this framework toward full operational deployment, future research should prioritize three distinct paths: integrating cradle-to-gate LCA once site-specific facility inventory data become available; developing dynamic ENA models that transition from steady-state assumptions to capture temporal and seasonal variations in material and energy flows; and conducting cross-regional validation by applying the framework to comparable data-scarce environments across Jordan, Tunisia, and sub-Saharan Africa.
AUTHOR CONTRIBUTIONS
D. S. Sayed co-conceived the research idea, designed the study, conducted the analysis, interpreted the results, prepared the original manuscript draft, and contributed to revising the manuscript. D.F.A. Nahla contributed to the study design, assisted in data analysis and interpretation, and critically reviewed the manuscript. H.N. Abdel Hamed co-conceived the research idea, supervised the research, interpreted the results, critically revised the manuscript, and approved the final version of the manuscript.
ACKNOWLEDGEMENT
The authors would like to thank the Department of Environmental Planning and Infrastructure, Faculty of Urban and Regional Planning, Cairo University, Giza, Egypt. No external funding was received for this study.
CONFLICT OF INTEREST
The authors declare that there is no conflict of interest regarding the publication of this manuscript. In addition, ethical issues, including plagiarism, informed consent, misconduct, data fabrication and/or falsification, double publication and/or submission, and redundancy, were observed by the authors.
OPEN ACCESS
©2026 The author(s). This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made. The images or other third-party material in this article are included in the article’s Creative Commons license, unless indicated otherwise in a credit line to the material. If material is not included in the article’s Creative Commons license and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this license, visit: http://creativecommons.org/licenses/by/4.0/
PUBLISHER’S NOTE
GJESM Publisher remains neutral regarding jurisdictional claims with regard to published maps and institutional affiliations.
R Positive AI Statement
During the preparation of this work, the authors used SciSpace to improve the academic writing and language of the manuscript and ChatGPT (OpenAI) to generate a number of graphical illustrations. After using these tools, the authors carefully reviewed and edited the content as needed and take full responsibility for the content of the publication.
ABBREVIATIONS
|
% |
Percent |
|
AHP |
Analytic hierarchy process |
|
APL |
Average path length |
|
CI |
Cycling index |
|
CO₂ |
Carbon dioxide |
|
CRITIC |
Criteria importance through intercriteria correlation |
|
DEM |
Digital elevation model |
|
E |
East |
|
EIP |
Eco-industrial park |
|
ENA |
Ecological network analysis |
|
EWM |
Entropy weight method |
|
FAO |
Food and Agriculture Organization of the United Nations |
|
FCI |
Finn cycling index |
|
GIS |
Geographical information system |
|
GIS-MCDA |
GIS-based multi-criteria decision analysis |
|
GJ |
Gigajoule |
|
ha |
Hectare |
|
IDW |
Inverse distance weighting |
|
IPCC |
Intergovernmental Panel on Climate Change |
|
kt/y |
Kilotonne per year |
|
LiDAR |
Light detection and ranging |
|
LCA |
Life cycle assessment |
|
LULC |
Land use/land cover |
|
m |
Metre |
|
mm |
Millimeter |
|
m³/y |
Cubic metre per year |
|
MCDA |
Multi-criteria decision analysis |
|
MENA |
Middle East and North Africa |
|
Mm²/y |
Million square metres per year |
|
MW |
Megawatt |
|
MWh |
Megawatt-hour |
|
MWth |
Megawatt thermal |
|
NC |
Network control |
|
OA |
Overall accuracy |
|
SDG |
Sustainable development goal |
|
SMCA |
Social multi-criteria analysis |
|
S |
South |
|
SRTM |
Shuttle radar topography mission |
|
t/y |
Tonne per year |
|
tCO₂/MWh |
Metric tons of carbon dioxide per megawatt-hour |
|
tCO₂/GJ |
Metric tons of carbon dioxide per gigajoule |
|
TEDA |
Tianjin economic-technological development area |
|
TST |
Total system throughput |
|
UNIDO |
United Nations Industrial Development Organization |
|
UTM |
Universal transverse mercator |
|
WGS |
World geodetic system |
REFERENCES
Chertow, M.R., (2000). Industrial symbiosis: Literature and taxonomy. Ann Rev. Energy Environ. 25(1), 313–337 (25 pages).
Chertow, M.R., (2007). "Uncovering" industrial symbiosis. J. Ind. Ecol., 11(1): 11–30 (20 pages).
Diakoulaki, D.; Mavrotas, G.; Papayannakis, L., (1995). Determining objective weights in multiple criteria problems: The CRITIC method. Comput. Oper. Res., 22(7): 763–770 (8 pages).
Eastman, J.R.; Jin, W.; Kyem, P.A.K.; Toledano, J., (1995). Raster procedures for multi-criteria/multi-objective decisions. Photogramm. Eng. Remote Sens., 61(5): 539–547 (9 pages).
Fath, B.D.; Patten, B.C., (1999). Review of the foundations of network environ analysis. Ecosystems. 2(2): 167–179 (13 pages).
Feizizadeh, B.; Blaschke, T., (2013). Land suitability analysis for Tabriz County, Iran: a multi-criteria evaluation approach using GIS. J. Environ. Plan. Manage., 56(1): 1–23 (23 pages).
Finnveden, G.; Hauschild, M.Z.; Ekvall, T.; Guinée, J.B.; Heijungs, R.; Hellweg, S.; Koehler, A.; Pennington, D.; Suh, S., (2009). Recent developments in Life Cycle Assessment. J. Environ. Manage., 91(1): 1–21 (21 pages).
Frosch, R.A.; Gallopoulos, N.E., (1989). Strategies for manufacturing. Sci. Am., 261(3): 144–152 (9 pages).
Gibbs, D.; Deutz, P., (2007). Reflections on implementing industrial ecology through eco-industrial park development. J. Clean. Prod., 15(17): 1683–1695 (13 pages).
Hong, H.; Gasparatos, A., (2020). Eco-industrial parks in China: Key institutional aspects, sustainability impacts, and implementation challenges. J. Clean. Prod., 274: 122853 (18 pages).
IEA, (2021). Global energy review 2021: assessing the effects of economic recoveries on global energy demand and CO₂ emissions in 2021. International Energy Agency. Paris, France (32 pages).
IPCC, (2022). Climate Change 2022: Impacts, Adaptation, and Vulnerability. Contribution of Working Group II to the Sixth Assessment Report of the Intergovernmental Panel on Climate Change. Cambridge University Press. Cambridge, UK and New York, NY, USA (3056 pages).
Laili, N.; Djatna, T.; Indrasti, N.S.; Yani, M., (2024). Optimization of industrial symbiosis in coffee-based eco industrial park design. Global J. Environ. Sci. Manage., 10(2): 621-642 (22 pages).
Layton, A.; Bras, B.; Weissburg, M., (2016). Ecological principles and metrics for improving material cycling structures in manufacturing networks. J. Manuf. Sci. Eng., 138(10): 101002 (12 pages).
Lotfi, F.H.; Fallahnejad, R., (2010). Imprecise Shannon's entropy and multi attribute decision making. Entropy. 12(1): 53–62 (10 pages).
Malczewski, J.; Rinner, C., (2015). Multicriteria Decision Analysis in Geographic Information Science. Springer. Berlin, Heidelberg (331 pages).
Nuhu, S.K.; Abdul Manan,Z.; Alwi, S.R.; Reba, M.N.M., (2021). A new hybrid modelling approach for an eco-industrial park site selection. Chem. Eng. Trans. 89: 343-348 (6 pages).
Nuhu, S.K.; Abdul Manan, Z.; Alwi, S.R.W.; Reba, M.N.M., (2022). Brownfields selection for eco-industrial parks using a novel integrated multi-criteria decision-making approach. Chem. Eng. Trans., 97: 7-12 (6 pages).
Park, H.S.; Rene, E.R.; Choi, S.M.; Chiu, A.S.F., (2008). Strategies for sustainable development of industrial park in Ulsan, South Korea — from spontaneous evolution to systematic expansion of industrial symbiosis. J. Environ. Manage., 87(1): 1–13 (13 pages).
Saaty, T.L., (1980). The Analytic Hierarchy Process. McGraw-Hill. New York (287 pages).
Shahat, M.; Sayed, D.; Qorqor, M.; Abdel Hamed, H., (2026). An integrated framework for sustainable natural resources management in freshwater lakes. Global J. Environ. Sci. Manage., 12(4) (26 pages).
Shannon, C.E., (1948). A mathematical theory of communication. Bell Syst. Tech. J., 27(3): 379–423 (45 pages).
Simboli, A.; Taddeo, R.; Morgante, A., (2015). The potential of industrial ecology in agri-food clusters: a case study based on valorisation of auxiliary materials. Ecol. Econ., 116: 65–75 (11 pages).
Sokka, L.; Pakarinen, S.; Melanen, M., (2011). Industrial symbiosis contributing to more sustainable energy use — an example from the forest industry in Kymenlaakso, Finland. J. Clean. Prod., 19(4): 285–293 (9 pages).
Spyridonidou, S.; Vagiona, D.G., (2021). A comparative analysis of decision-making methods on site suitability for on- and offshore wind farms: the case of regional unit of Euboea, Greece. Circ. Econ. Sustainable. 2(4): 1561–1574 (14 pages).
Tian, J.; Liu, W.; Lai, B.; Li, X.; Chen, L., (2014). Study of the performance of eco-industrial park development in China. J. Clean. Prod., 64: 486–494 (9 pages).
UNIDO, (2019). Global eco-industrial parks programme: international framework for eco-industrial parks. United Nations Industrial Development Organization. Vienna (88 pages).
Valenzuela-Venegas, G.; Henríquez-Henríquez, F.; Donoso-Bravo, A.; Díaz-Alvarado, F.A., (2018). A resilience indicator for eco-industrial parks. J. Clean. Prod. 174: 807–820 (14 pages).
Wang, T.C.; Lee, H.D., (2009). Developing a fuzzy TOPSIS approach based on subjective weights and objective weights. Expert Syst. Appl., 36(5): 8980–8985 (6 pages).
World Bank, (2020). Eco-industrial parks: a toolkit for practitioners. World Bank Group. Washington, DC (80 pages).
Xu, J.; Zhang, R.; Wang, Y.; Yan, H.; Liu, Q., (2022). A new framework for assessment of offshore wind farm location. Energies. 15(18): 6758 (17 pages).
Yu, J.L.; Zhang, J.; Zhou, M.; Cai, W., (2023). Impact of COVID-19 on the comprehensive resilience of rural areas. Sustainability. 15(4): 3152 (18 pages).
Zandi, I.; Pahlavani, P.; Bigdeli, B., (2021). Combining CRITIC objective weighting method with CODAS and VIKOR methods for selecting prospect hospital sites (Case study: District 5 of Tehran). J. Geogr. Urban Space Dev., 8(2): 1–14 (14 pages).
Zhang, Y.; Zheng, H.; Chen, B.; Yang, N., (2013). Social network analysis and network connectedness analysis for industrial symbiotic systems. Front. Earth Sci., 7(2): 169–181 (13 pages).
Zhu, Q.; Lowe, E.A.; Wei, Y.A.; Barnes, D., (2007). Industrial symbiosis in China: a case study of the Guitang Group. J. Ind. Ecol., 11(1): 31–42 (12 pages).
Zou, Z.H.; Yi, Y.; Sun, J.N., (2006). Entropy method for determination of weight of evaluating indicators in fuzzy synthetic evaluation for water quality assessment. J. Environ. Sci., 18(5): 1020–1023 (4 pages).
OPEN ACCESS
©2026 The author(s). This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made. The images or other third party material in this article are included in the article’s Creative Commons license, unless indicated otherwise in a credit line to the material. If material is not included in the article’s Creative Commons license and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this license, visit: http://creativecommons.org/licenses/by/4.0/
PUBLISHER NOTE
GJESM Publisher remains neutral concerning jurisdictional claims in published maps and institutional affiliations.
MAJOR DATABASES, CITATION METRICS & CAPTURES
Google Scholar | Scopus - SJR | Web of Science | Biological Abstracts: Clarivate | Biosis Preview: Clarivate | PlumX Metrics | Altmetrics | Mendeley |
CURRENT PUBLISHER
| Article View | 1,261 |
| PDF Download | 604 |
Letters to Editor
[1] Letters that include statements of statistics, facts, research, or theories should include appropriate references, although more than three are discouraged.
[2] Letters that are personal attacks on an author rather than thoughtful criticism of the author’s ideas will not be considered for publication.
[3] Letters can be no more than 300 words in length.
[4] Letter writers should include a statement at the beginning of the letter stating that it is being submitted either for publication or not.
[5] Anonymous letters will not be considered.
[6] Letter writers must include their city and state of residence or work.
[7] Letters will be edited for clarity and length.